Europe
Asia
Oceania
Americas
Africa
A Class 08 shunter converted to hydrogen power has
D3265 – Llangollen: Work has continued on the overhaul of the Class 08 based in North Wales, with a start made on looking at the valves and guides and also pressure testing of the block itself. Firstl
There are many reasons why locomotives might be fitted with replacement engines to new designs. PIP DUNN looks at various projects and explains why they occurred
AS MANY as 15 Class 37s could attend the Severn Valley Railway’s October 2-5 celebration of 65 years of the popular English Electric Type 3s. The SVR has decided to hand over its regular autumn diesel
Overhauls, restorations and running notes
A START on the main line testing of GBRf’s new Stadler Class 99s, running under their own power, started on July 23 when 99001 worked 4Q90, the 21.50 Peterborough Yard-Doncaster Decoy Yard test train.
EUROPHOENIX RAIL has had unveiled its 37423 in a new grey and turquoise livery. The repaint was undertaken by Boden Rail Engineering at its Colwick depot, near Nottingham. The ex-DRS loco was revealed