Europe
Asia
Oceania
Americas
Africa
Pip Dunn
This time of the year is traditionally quiet because many of the summer-only promoters don’t have much to say as they are working behind the scenes to announce programmes, probably sometime in Februar
Running a rail timetable relies on the right number of locos, coaches, and staff being fit and in the right place. But on a network the size and complexity of British Rail, sometimes – in fact, often
As the company gets ready to operate its final charter trains next month, PIP DUNN looks back over half a century of Pathfinder’s popular excursions covering the length and breadth of the UK network
07013 – Bury: A few steps forward were made in early August when the locomotive was lifted from its wheels. All wheelsets require tyre turning to restore their profiles, and the Class 07’s sole AEI RT
More Mk. 5 sets prepared for Chiltern Railways For a few days in late October, Long Marston was devoid of Mk. 5 sets following the removal of CH09 (11509, 12725-727, 12809) to Eastleigh Works by 37608
PART TWO