Europe
Asia
Oceania
Americas
Africa
DE WINTON 0 ‐ 4‐0VBT Chaloner hauled it
Overhauls, restorations and running notes
THE DELTIC Preservation Society has returned a fully overhauled Napier 18-25 engine into 55009 Alycidon on November 17 and in doing so has achieved two major milestones. First is PU430 has worked succ
As 2025 draws to a conclusion, it’s time to look back at another varied year on Britain’s railways, and, as ever, there have been many developments, not all for the better, but plenty of good news as
03145 – Moreton Park: In September, the reduced-height 03 received a layer of polish from the top down to give it some protection during the winter. Some rust spots on the cab end and sides were treat
The tie-up between UK Railtours and LSL to run its January 24 ‘Peak Blinder’ tour is an interesting development. Assuming all goes well, and there is no reason to wonder why it might not, it could hop
PRESERVED PEAK 45133’s Sulzer 12LDA28-B engine was started on December 11 for the first time in eight years, since the loco was stopped for overhaul in September 2017. The loco, owned by the Class 45/