Europe
Asia
Oceania
Americas
Africa
This fun, fabulous cape makes a cosy cover-up for winter and spring
DARIO TUBIANA
DARIO TUBIAN
MEASUREMENTS To fit sizes: 86/91 cm (34/36 ins), 97/102 (38/40), 107/112 (42/44), 117/122 (46/48), 127/132 (50/52), 137/142 (54/56). Actual size: 104 cm (41 ins), 114 (45), 124 (49), 134 (53), 144 (57
CABLE DECREASE When casting off the 6-st cable in the centre of Chart D on Back and Front, work as follows: K1, (K2tog) twice, K1. This decreases the 6-st cable to 4 sts and stops it flaring. SADDLE S
Cast on 47 (53: 57: 63: 69: 73: 79: 83: 91) sts loosely using 9mm needles. Beg with a K row, now work in st st throughout as folls: Cont straight until Front meas 15 (15: 15: 15.5: 15.5: 15.5: 16: 16:
Using 3.25mm needles and yarn A, cast on 110 (122:134:146:158) sts. Row 1 (RS): K2, *P2, K2; rep from * to end. Row 2: P2, *K2, P2; rep from * to end. These 2 rows set rib. Cont in rib until Back meas
The pattern is worked in stranded colourwork in stocking stitch with edge stitches worked in garter stitch while worked flat, and then only in stocking stitch when joined in the round. RIGHT SHOULDER
To avoid a jog in the stripes, work to the last stitch of the purl round of each 2-row stripe, Sl 1, lift loop of the stitch below the start of round onto RH needle, slip both sts to LH needle, P2tog