Europe
Asia
Oceania
Americas
Africa
This aran-weight, shawl-collared sweater has a subtle colourwork pattern
(written instructions)Row 1 (RS): Purl.Row 2 (WS): K2, P3, K12, P3, K2, (K4, P3,K12, P3, K2) 4 (4:5:5:6:6:7) times.Row 3: (P2, T4F, P4, K2, P4, T4B, P4)4 (4:5:5:6:6:7) times, P2, T4F, P4, K2, P4,T4B,
The full chart has been split in two. When working the Back, follow the complete chart working Row 1 from the first half of the chart at the top of the page and continuing Row 1 from the second half o
Using 4.5mm needles and the thumb method, cast on 117 (129:141:153:165:177:189) sts. Row 1 (RS): *K1, P1; rep from * to last st, K1. Row 2: P1, *K1, P1; rep from * to end. Rows 1 and 2 set 1x1 rib. Wo
Using 3.25mm needles, cast on 115 (127:137:149:159:171) sts. Row 1 (RS): K2, (P1, K1) to last st, K1. Row 2: K1, (P1, K1) to end. Rep Rows 1 and 2 another 5 times, then work Row 1 once more. Next row
LEFT FRONT Cast on 51 (55: 63: 67: 75: 79: 87: 91: 99) sts using 3.25mm needles and Yarn A. Row 1 (RS) *K2, P2, rep from * to last 3 sts, K3. Row 2 K1, P2, *K2, P2, rep from * to end. These 2 rows for
Using 3mm needles and yarn A, cast on 106 (118:130:142:154) sts. Row 1 (RS): K2, *P2, K2; rep from * to end. Row 2 (WS): P2, *K2, P2; rep from * to end. These 2 rows form rib. Work a further 8 rows in